지금 지원 담당자와 채팅
지원 담당자와 채팅

Identity Manager 9.1 - Target System Synchronization Reference Guide

Target system synchronization with the Synchronization Editor Working with the Synchronization Editor Basics of target system synchronization Setting up synchronization
Starting the Synchronization Editor Creating a synchronization project Configuring synchronization
Setting up mappings Setting up synchronization workflows Connecting systems Editing the scope Using variables and variable sets Setting up start up configurations Setting up base objects
Overview of schema classes Customizing the synchronization configuration Checking the consistency of the synchronization configuration Activating the synchronization project Defining start up sequences
Running synchronization Synchronization analysis Setting up synchronization with default connectors Updating existing synchronization projects Script library for synchronization projects Additional information for experts Troubleshooting errors when connecting target systems Configuration parameters for target system synchronization Configuration file examples

Setting up synchronization

Use the Synchronization EditorClosed to configure connections for different target system in One Identity Manager. The components of a synchronization configuration are used for both synchronization and for provisioning and synchronizing single objects. Synchronization can be configured so it can be used for connecting different target systems of the same target system type.

Table 29: Synchronization configuration components
Term Described in
base object Setting up base objects
Mapping Setting up mappings
Start configurationClosed Setting up start up configurations
Synchronization projectClosed Creating a synchronization project
Variable setClosed Using variables and variable sets
WorkflowClosed Setting up synchronization workflows

Starting the Synchronization Editor

There are different ways to start the Synchronization EditorClosed.

  • From the Windows start menu using the One Identity > One Identity Manager > Configuration > Synchronization Editor entry.

  • From the Launchpad.

  • In the Manager

  • From the command line.

Related topics

Creating a synchronization project

A synchronization projectClosed collects all the information required for synchronizing the One Identity Manager database with a target system. Connection data for target systems, schema types and properties, mapping, and synchronization workflowsClosed all belong to this.

Prerequisites

  • A synchronization serverClosed is set up and declared in the One Identity Manager database.

There is a wizard to assist you with setting up a synchronization project. This wizard takes you through all the steps you need to set up initial synchronization with a target system. The project wizard takes over the following tasks:

  • Connecting to the Target System
  • Connecting to the One Identity Manager database
  • Defining synchronization behavior

    The synchronization behavior can be configured based on target system-specific project templatesClosed. For certain target systems, One Identity Manager supplies a default project template. The project wizard copies the project template data. This can be modified with the project wizard to suit the new synchronization project. Just one synchronization project can be created per target system and default project template used.

After saving the synchronization project, you can alter the synchronization configuration.

To complete synchronization configuration

  1. Check the mappings, workflows, start up configuration, and system connection that the wizard has added.
  2. Assign a scheduleClosed to the start up configuration.
  3. If you want to use the synchronization project to synchronize different target systems, specify variables, and variable sets.
  4. Activate the synchronization project. The synchronization cannot be started until these are resolved.

NOTE: The current synchronization project is closed when you open another synchronization project.

Detailed information about this topic

How to create a synchronization project

NOTE: The current synchronization projectClosed is closed when you open another synchronization project.

To create a new synchronization project

  1. Select the synchronization project view on the home page.

  2. Click Start a new synchronization project.

    This starts the project wizard.

  3. Follow the project wizard instructions.

  4. Click Commit to database to save the new project.
관련 문서

The document was helpful.

평가 결과 선택

I easily found the information I needed.

평가 결과 선택