Not all system connectors provide a project templateTemplateRule for mappingList of object matching rules and property mapping rules which map the schema properties of two connected systems to one another. object properties. Templates can be applied to an object and also have a cross-object effect. used by the project wizard to create a preconfigured synchronizationThe processSequence of process steps for mapping an operational workflow. The process steps are connected to one another by predecessor/successor relationships. This functionality allows flexibility when linking up actions and sequences on object events. of comparing data between One Identity Manager and a target system. Objects and their properties are compared by fixed rules. Synchronization results in the identical data situation in the target system and One Identity Manager database. project. for creating a full configured synchronization projectA collection of all data required for synchronizing and provisioning a target system. Connection data, schema classes and properties, mappings, and synchronization workflows all belongs to this.. Therefore, you can also create a synchronization project manually. In this case, the project wizard sets up the system connection. All other synchronization configuration components must be configured after you have saved the synchronization project.
To manually set up synchronization of the One IdentityAn identity usually represents a real person. In addition, identities that do not represent real people, such as machine identities or service identities, can be mapped in One Identity Manager. (see also virtual identity; see also main identity/subidentity) Manager database with a target system
- Install and configure a synchronization serverJob serverServer with the One Identity Manager Service installed. installed with the target system connector. All One Identity Manager actions are run against the target system environment on the synchronization server. and declare the server as a Job server in One Identity Manager.
- Create a new synchronization project.
- The project wizard sets up the system connection.
- On the Select project template page, select Create blank project.
-
Add mappings. Define property mapping rules and object matching rules.
-
Create synchronization workflowsSpecifies the order of all the synchronization stepsSpecific rule for processing exactly two schema classes. to be run during synchronization..
-
Create a start up configuration.
-
Define the synchronization scope.
-
Specify the base object of the synchronization.
-
Specify the extent of the synchronization log.
-
Run a consistency check.
-
Activate the synchronization project.
-
Save the new synchronization project in the database.