SynchronizationThe processSequence of process steps for mappingList of object matching rules and property mapping rules which map the schema properties of two connected systems to one another. an operational workflow. The process steps are connected to one another by predecessor/successor relationships. This functionality allows flexibility when linking up actions and sequences on object events. of comparing data between One Identity Manager and a target system. Objects and their properties are compared by fixed rules. Synchronization results in the identical data situation in the target system and One Identity Manager database. is started using scheduledTask to run on a cyclical basis. Schedules control regular running of processes, calculation tasks, and other scheduled tasks. You define the start and interval times for the scheduled tasks. The activation time can be given in local time or Universal Time Code. A schedule can be in control of several tasks. process plansContains the basic configuration for automatically running a process.. A scheduled process plan is added once a start up configuration is assigned to a schedule. Use schedules to define running times for synchronization.
NOTE: Synchronization can only be started if the synchronization projectA collection of all data required for synchronizing and provisioning a target system. Connection data, schema classes and properties, mappings, and synchronization workflows all belongs to this. is enabled.
IMPORTANT: As long as synchronization is running, you must not start another synchronization for the same target system. This applies especially, if the same synchronization objects would be processed.
If another synchronization is started with another start up configuration, that addresses same target system, it may lead to synchronization error or loss of data. Plan your start times carefully. If possible, specify your start times so that synchronization does not overlap.
To assign an existing schedule to a start up configuration
- Select the Configuration > Start up configurations category.
- Select a start up configuration in the document view and click Edit.
- Select a schedule from the Schedule menu.
All active schedules assigned to the table JobAutoStart are available for selection.
- Click OK.
One Identity Manager specifies a process plan when changes are committed to the One Identity Manager database. This process plan starts the synchronizing process.