サポートと今すぐチャット
サポートとのチャット

Identity Manager 9.2.1 - Target System Synchronization Reference Guide

Target system synchronization with the Synchronization Editor Working with the Synchronization Editor Basics of target system synchronization Setting up synchronization
Starting the Synchronization Editor Creating a synchronization project Configuring synchronization
Setting up mappings Setting up synchronization workflows Connecting systems Configuring the synchronization log Editing the scope Using variables and variable sets Setting up start up configurations Setting up base objects
Overview of schema classes Customizing the synchronization configuration Checking the consistency of the synchronization configuration Activating the synchronization project Defining start up sequences Copying synchronization projects
Running synchronization Synchronization analysis Setting up synchronization with default connectors Updating existing synchronization projects Script library for synchronization projects Additional information for experts Troubleshooting errors when connecting target systems Configuration parameters for target system synchronization Configuration file examples

How to create a synchronization project

NOTE: The current synchronization projectClosed is closed when you open another synchronization project.

To create a new synchronization project

  1. Select the synchronization project view on the home page.

  2. Click Start a new synchronization project.

    This starts the project wizard.

  3. Follow the project wizard instructions.

  4. Click Commit to database to save the new project.

How to edit a synchronization project

NOTE: The current synchronization projectClosed is closed when you open another synchronization project.

To open a synchronization project

  1. Select the synchronization project view on the start page.

  2. Select the synchronization project you want to load by double-clicking on it.

    TIP: To limit the list of synchronization projects displayed, select the target system connection you want on the left-hand side of the project selection view.

  3. If the synchronization project was already opened by another user, a message appears.

    • To open the synchronization project anyway, click OK.

      You cannot save changes to the synchronization project.

  4. If the connection data is encrypted, enter the values required to establish the system connection and click OK.

  5. Edit the mappings, workflows, and other components of the synchronization configuration.

To edit synchronization project properties

  1. Select the synchronization project view on the start page.

  2. Select the synchronization project you want to load by double-clicking on it.

  3. If the connection data is encrypted, enter the values required to establish the system connection and click OK.

  4. Click Edit....

    If the synchronization project was already opened by another user, the button is disabled.

  5. Edit the display name and the synchronization project description.

  6. Click OK.
Detailed information about this topic

How to delete a synchronization project

NOTE: The current synchronization projectClosed is closed when you open another synchronization project.

To delete a synchronization project

  1. Select the synchronization project view on the start page.
  2. Select the synchronization project to delete.

    TIP: To limit the list of synchronization projects displayed, select the target system connection you want on the left-hand side of the project selection view.

  3. Click in the project selection view toolbar.
  4. Confirm the security prompt with Yes.

The scheduleClosed assigned to this synchronization project is also deleted if it is not used by any other database object.

General properties of a synchronization project

You can edit the synchronization projectClosed's display names and description on the General tab.

Table 28: General properties of a synchronization project
Property Description
Display name Display name for the synchronization project.
Script language Language in which the scripts for this synchronization project are written.

Enable shadow copyClosed

The synchronization project can be additionally saved in the database as an XML definition. Afterward, the synchronization project is only loaded from this XML definition. The project loads noticeably faster.

NOTE: The shadow copy does not contain any changes that were made directly in the database and not in the Synchronization EditorClosed.

Only if the synchronization project is active

The shadow copy is only created if the synchronization project is active.

Description Text field for additional explanation.
Related topics
関連ドキュメント

The document was helpful.

評価を選択

I easily found the information I needed.

評価を選択