Chat now with support
Chat mit Support

Identity Manager 8.1.4 - Target System Synchronization Reference Guide

Target system synchronization with the Synchronization Editor Working with the Synchronization Editor Basics of target system synchronization Setting up synchronization
Starting the Synchronization Editor Creating a synchronization project Configuring synchronization
Setting up mappings Setting up synchronization workflows Connecting systems Editing the scope Using variables and variable sets Setting up start up configurations Setting up base objects
Overview of schema classes Customizing the synchronization configuration Checking the consistency of the synchronization configuration Activating the synchronization project Defining start up sequences
Running synchronization Synchronization analysis Setting up synchronization with default connectors Updating existing synchronization projects Script library for synchronization projects Additional information for experts Resolving errors when connecting target systems Configuration parameters for target system synchronization Configuration file examples Glossary

Creating a synchronization project

A synchronization projectClosed collects all the information required for synchronizing the One Identity Manager database with a target system. Connection data for target systems, schema types and properties, mapping, and synchronization workflows all belong to this.

Prerequisites

  • A synchronization server is set up and declared in the One Identity Manager database.

There is a wizard to assist you with setting up a synchronization project. This wizard takes you through all the steps you need to set up initial synchronization with a target system. The project wizard takes over the following tasks:

  • Connecting to the Target System
  • Connecting to the One Identity Manager database
  • Defining synchronization behavior

    The synchronization behavior can be configured based on target system-specific project templatesClosed. Project templates are supplied by One Identity Manager for certain target systems, The project wizard copies the project template data. This can be modified with the project wizard to suit the new synchronization project. Just one synchronization project can be created per target system and default project template used.

After saving the synchronization project, you can alter the synchronization configuration.

To complete synchronization configuration

  1. Check the mappings, workflows, start up configuration, and system connection that the wizard has added.
  2. Assign a schedule to the start up configuration.
  3. If you want to use the synchronization project to synchronize different target systems, specify variables, and variable sets.
  4. Activate the synchronization project. The synchronization cannot be started until these are resolved.

NOTE: The current synchronization project is closed when you open another synchronization project.

Detailed information about this topic

How to create a synchronization project

NOTE: The current synchronization projectClosed is closed when you open another synchronization project.

To create a new synchronization project

  1. Select the synchronization project view on the start page.
  2. Click Start a new synchronization project.

    This starts the project wizard.

  3. Follow the project wizard instructions.
  4. Click Commit to database to save the new project.

How to edit a synchronization project

NOTE: The current synchronization projectClosed is closed when you open another synchronization project.

To open a synchronization project

  1. Select the synchronization project view on the start page.
  2. Select the synchronization project you want to load by double-clicking on it.
    TIP: To limit the list of synchronization projects displayed, select the target system connection you want on the left-hand side of the project selection view.
  3. If the connection data is encrypted, enter the values required to establish the system connection and click OK.
  4. Edit the mappings, workflows, and other components of the synchronization configuration.

To edit synchronization project properties

  1. Select the synchronization project view on the start page.
  2. Select the synchronization project you want to load by double-clicking on it.
  3. If the connection data is encrypted, enter the values required to establish the system connection and click OK.
  4. Click Edit....
  5. Edit the display name and the synchronization project description.
  6. Click OK.
Detailed information about this topic

How to delete a synchronization project

NOTE: The current synchronization projectClosed is closed when you open another synchronization project.

To delete a synchronization project

  1. Select the synchronization project view on the start page.
  2. Select the synchronization project to delete.
    TIP: To limit the list of synchronization projects displayed, select the target system connection you want on the left-hand side of the project selection view.
  3. Click in the project selection view toolbar.
  4. Confirm the security prompt with Yes.

The schedule assigned to this synchronization project is also deleted if it is not used by any other database object.

Verwandte Dokumente

The document was helpful.

Bewertung auswählen

I easily found the information I needed.

Bewertung auswählen