Enabling and disabling schedules
You can enable and disable schedules. Only enabled schedules can be run.
To enable a single schedule in the Designer
-
In the Designer, select the Base data > General > Schedules category.
-
Select the schedule.
-
Set Enabled.
-
Select the Database > Save to database and click Save.
To disable a single schedule in the Designer
-
In the Designer, select the Base data > General > Schedules category.
-
Select the schedule.
-
Disable the Enable option.
-
Select the Database > Save to database and click Save.
Zeitpläne automatisiert ausführen
Aktivierte Zeitpläne werden automatisiert ausgeführt, wenn der Konfigurationsparameter QBM | Schedules aktiviert ist. In the Designer, check if the configuration parameter is set. If not, set the configuration parameter.
Um die automatisierte Ausführung aller Zeitpläne temporär anzuhalten, deaktivieren Sie im Designer den Konfigurationsparameter QBM | Schedules. This stops the schedules from being run automatically. However, you can still start schedules manually.
Starting schedules immediately
Normally, schedules are started automatically. If necessary, you can start a schedule manually at any time.
NOTE: Before you start a schedule manually, check whether other processes that also need to be preprocessed by One Identity Manager will be run as a result.
To start a schedule in the Designer immediately
-
In the Designer, select the Base data > General > Schedules category.
-
Select the schedule.
-
Click Start.
-
Confirm the security prompt with Yes.
NOTE: The last processing time is not updated when the schedule is started manually.
Creating and editing schedules
If necessary, you can change the default schedules or create new schedules.
To create a schedule in the Designer
-
In the Designer, select the Base data > General > Schedules category.
-
Select the Object > New menu item to create a new schedules.
-
Edit the schedule’s main data.
-
Select the Database > Save to database and click Save.
To edit a schedule in the Designer
-
In the Designer, select the Base data > General > Schedules category.
-
Select a schedule.
-
Edit the schedule’s main data.
-
Select the Database > Save to database and click Save.