Chat now with support
Chat with Support

Identity Manager 8.1.5 - Administration Guide for Connecting to G Suite

Mapping G Suite in One Identity Manager Synchronizing G Suite Managing G Suite user accounts and employees Provision of login information for G Suite user accounts Managing G Suite entitlement assignments Mapping of G Suite objects in One Identity Manager
G Suite customers G Suite user accounts G Suite groups G Suite products and SKUs G Suite organizations G Suite domains G Suite domain aliases G Suite admin roles G Suite admin privileges G Suite admin role assignments Reports about G Suite objects
Handling of G Suite objects in the Web Portal Basic data for managing G Suite Troubleshooting the connection to a G Suite environment Configuration parameters for managing G Suite Default project templates for G Suite API scopes for the service account Processing G Suite system objects Special features in the assignment of G Suite groups About us

Configuring synchronization in G Suite

The synchronization project for initial synchronization provides a workflow for initial loading of target system objects (initial synchronization) and one for provisioning object modifications from the One Identity Manager database to the target system (provisioning). To use One Identity Manager as the master system during synchronization, you also require a workflow with synchronization in the direction of the Target system.

To create a synchronization configuration for synchronizing G Suite

  1. Open the synchronization project in the Synchronization Editor.

  2. Check whether existing mappings can be used for synchronizing the target system. Create new maps if required.
  3. Create a new workflow with the workflow wizard.

    This creates a workflow with Target system as its synchronization direction.

  4. Create a new start up configuration. Use the new workflow to do this.
  5. Save the changes.
  6. Run a consistency check.

Related topics

Configuring synchronization of different customers

In some circumstances, you can use a synchronization project to synchronize different customers.

Prerequisites

  • The customer target systems schema are identical.

  • All virtual schema properties used in the mapping must exist in the customer's extended schemas.

  • The connection parameters to the target system are defined as variables.

To customize a synchronization project for synchronizing another customer

  1. Supply a user in the customer with sufficient permissions for accessing G Suite.

  2. Open the synchronization project in the Synchronization Editor.

  1. Create a new base object for the other customer. Use the wizard to attach a base object.

    • In the wizard, select the G Suite connector and declare the connection parameters. The connection parameters are saved in a special variable set.

      A start up configuration is created that uses the newly created variable set.

  2. Change other elements of the synchronization configuration as required.

  3. Save the changes.
  4. Run a consistency check.

Related topics

Updating schemas

All the schema data (schema types and schema properties) of the target system schema and the One Identity Manager schema are available when you are editing a synchronization project. Only a part of this data is really needed for configuring synchronization. If a synchronization project is finished, the schema is compressed to remove unnecessary data from the synchronization project. This can speed up the loading of the synchronization project. Deleted schema data can be added to the synchronization configuration again at a later point.

If the target system schema or the One Identity Manager schema has changed, these changes must also be added to the synchronization configuration. Then the changes can be added to the schema property mapping.

To include schema data that have been deleted through compression and schema modifications in the synchronization project, update each schema in the synchronization project. This may be necessary if:

  • A schema was changed by:

    • Changes to a target system schema

    • Customizations to the One Identity Manager schema

    • A One Identity Manager update migration

  • A schema in the synchronization project was shrunk by:

    • Enabling the synchronization project

    • Saving the synchronization project for the first time

    • Compressing a schema

To update a system connection schema

  1. Open the synchronization project in the Synchronization Editor.

  2. Select the Configuration | Target system category.

    - OR -

    Select the Configuration | One Identity Manager connection category.

  3. Select the General view and click Update schema.

  4. Confirm the security prompt with Yes.

    This reloads the schema data.

To edit a mapping

  1. Select the Mappings category.

  2. Select a mapping in the navigation view.

    Opens the Mapping Editor. For more detailed information about mappings, see the One Identity Manager Target System Synchronization Reference Guide.

NOTE: The synchronization is deactivated if the schema of an activated synchronization project is updated. Reactivate the synchronization project to synchronize.

Speeding up synchronization with revision filtering

Synchronization with G Suite does not support revision filtering.

Related Documents

The document was helpful.

Select Rating

I easily found the information I needed.

Select Rating